East Star Resources - Exploration Target: Verkhuba Cu-Zn-Pb Deposit
Released
Released
Announcement PDF
RNS Number : 5888T
East Star Resources PLC
21 March 2023
THIS ANNOUNCEMENT CONTAINS INSIDE INFORMATION FOR THE PURPOSES OF ARTICLE 7 OF REGULATION
2014/596/EU WHICH IS PART OF DOMESTIC UK LAW PURSUANT TO THE MARKET ABUSE (AMENDMENT) (EU EXIT)
REGULATIONS (SI 2019/310) ("UK MAR"). UPON THE PUBLICATION OF THIS ANNOUNCEMENT, THIS INSIDE
INFORMATION (AS DEFINED IN UK MAR) IS NOW CONSIDERED TO BE IN THE PUBLIC DOMAIN.
NOT FOR RELEASE, PUBLICATION OR DISTRIBUTION, IN WHOLE OR IN PART, DIRECTLY OR INDIRECTLY IN OR
INTO THE UNITED STATES, AUSTRALIA, CANADA, JAPAN, THE REPUBLIC OF SOUTH AFRICA OR ANY OTHER
JURISDICTION WHERE TO DO SO WOULD CONSTITUTE A VIOLATION OF THE RELEVANT LAWS OF SUCH
JURISDICTION.
21 March 2023
East Star Resources Plc
("East Star" or the "Company")
Independent Exploration Target for Verkhuba Copper-Zinc-Lead Deposit, Kazakhstan
East Star Resources Plc (LSE:EST), which is defining mineral resources in Kazakhstan for the energy revolution, is
pleased to announce an independent JORC-compliant Exploration Target conducted by leading resource advisors
AMC Consultants on the Verkhuba Copper-Zinc-Lead Deposit on the Rudny Altai VMS belt.
Highlights:
· Exploration Target of 19-23 Mt at 1.0-1.4% Cu and 1.0-1.4% Zn (1.4-1.9% CuEq)
·
Exploration Target is defined by 97 drill holes comprising 42,178 m of historical diamond drilling,
reviewed by East Star over the past 12 months, providing a reasonable level of confidence in the
geological interpretation
· Historical drilling was over 2.89 km2 of laterally extensive mineralisation in a grid pattern of circa 100x100 m
in the central part of the deposit and 200x100 m on its flanks
·
Further possible significant exploration upside exists in drill-ready satellite targets identified in 2022
helicopter electromagnetic ("HEM") survey
· Historical metallurgical test work reported Au and Ag grades in technological samples equal to 0.3 g/t Au
and 14.2 g/t Ag indicating potential to further enhance the value per tonne of ore
· Potential for low-CAPEX development using existing processing capacity within the region
· Verification and infill drilling has been planned to upgrade Exploration Target to JORC-compliant resources
with drilling expected to commence this summer
Exploration Target Summary Table
Mining method
Open pit
Underground
Total
Tonnes
(kt)
5,000 - 6,000
14,000 - 17,000
19,000 - 23,000
Zn
(%)
0.5 - 0.8
1.2 - 1.6
1.0 - 1.4
Cu
(%)
1.4 - 1.8
0.8 - 1.2
1.0 - 1.4
Pb
(%)
0.1 - 0.2
0.1 - 0.2
0.1 - 0.2
·
This is an Exploration Target and should not be considered to be a Mineral Resource
·
The Exploration Target assumes an open pit mining method with marginal cut-off of 0.38% Cu equivalent
and underground mining method with the marginal cut-off of 0.86% Cu equivalent
·
A nominal dry density values of 3.0 t/m3 was assumed to be appropriate for the style of mineralisation
·
Cu equivalent was calculated using the following metal prices: 3,050 US$/t for Zn, 9,000 US$/t for Cu, 2,250
US$/t for Pb
·
Tonnage is reported on dry basis
Chart, diagram Description automatically generated
Figure 1 Micromine model of ore bodies including modelled open pit scenario.
Alex Walker, East Star CEO, commented:
"This Exploration Target validates the statement that the Verkhuba Deposit is a game changer for East Star. The
Exploration Target is based on 42,178 m of historical diamond drilling which should require a limited twin drilling
programme to upgrade to JORC-compliant resources. The Exploration Target of 19-23 Mt @ 1.4% - 1.9% Cu equivalent is
already significant, with potential for additional tonnage in some of the orebodies.
"The Verkhuba Deposit is 2.89 km2 within a 30 km2 ore district which also includes multiple drill-ready HEM targets.
Furthermore, with significant infrastructure already in place and excess processing capacity within the region from both
Glencore (Kazzinc) and KAZ Minerals, it may be possible to fast track the Verkhuba Deposit into production with low
capital expenditure.
"With high-grade copper mineralisation already identified, significant exploration upside and a potential route to lowCAPEX development, East Star is uniquely positioned for growth in 2023 within a progressive mining jurisdiction. We are
eager to commence verification and infill drilling over the Verkhuba Deposit this summer."
Webcast Presentation
A short webcast presentation about the independent Exploration Target for the Verkhuba Copper-Zinc-Lead
Deposit by East Star's CEO is available via the Company's website at: https://www.eaststarplc.com/presentations.
Background
East Star Resources commissioned AMC Consultants Pty Ltd ("AMC") to prepare a Mineral Resource Estimate
("MRE") and a conceptual pit optimisation and analysis for the Verkhuba Deposit located in eastern Kazakhstan.
For reporting purposes, the MRE was converted to an Exploration Target range under JORC reporting standards.
Exploration of the project area was carried out in the 1950s through to the 1990s, mostly by surface core drilling.
Exploration adits and drives were also developed at the Verkhuba Deposit, but the database for underground
channel sampling was not available. Mineralised bodies are represented by VMS shallow dipping sheet-like bodies
and lenses.
A total of 97 diamond drillholes define the Verkhuba Deposit with a total of 42,178 m of drilling. 62 drillholes were
used for the grade estimate. The deposit area was sampled using diamond drillholes at variable spacings - from
200 m x 200 m to 100 m x 100 m spacing.
To establish the Exploration Target, AMC completed the following phases of work:
·
Database import and validation
·
Classical statistical analysis
·
Interpretation and wireframing of mineralised zones using metal equivalent grades available
in the database
·
Data selection and compositing
·
Block model development
·
Grade interpolation and model validation
·
Preliminary pit optimisation study using a base case scenario
·
Pit analysis and a preliminary scoping estimate of the deposit's economic potential
·
Development of verification and an infill drilling programme
Geological modelling was completed by AMC which resulted in 59 interpreted and wireframed mineralised bodies.
A block model constrained by the interpreted mineralised bodies was constructed with the parent cell size of 5 mE
x 5 mN x 2 mRL with standard sub-celling five times in all directions to maintain the volume resolution of the
mineralised bodies. Drillhole sample intervals have been composited to 1 m length and were used to interpolate
all main modelled grades (Zn, Pb, Cu) into the block model using ordinary kriging (OK) interpolation techniques.
Block grades were validated both visually and statistically and all modelling was completed using Micromine
software.
Constant average bulk density values of 3.0 t/m3 were applied to each model cell, which was assumed from the
historical reports.
Exploration Target
The grade estimate and subsequent Exploration Target allowed an assessment of the integrity of the input data. It
was also used to confirm estimation and reporting of exploration potential ranges of tonnage and grades for the
Verkhuba Deposit. The Exploration Target is to be reported in accordance with the JORC Code*.
Table 1 shows the Exploration Target for the Verkhuba Deposit for both open pit and underground mining
methods. The Exploration Target is based on actual Exploration Results that were obtained during several
historical exploration programmes completed between 1950 and 1990 when a total number of 97 diamond holes
were drilled totaling 42,178 m. The estimated potential quantity of tonnes and grades are conceptual in nature as
there has been insufficient data and evaluation to support estimation of a Mineral Resource. Tonnages and
grades are expressed as ranges that are considered appropriate for the Exploration Target. There is no certainty
that further exploration, verification drilling, or twinned drilling will result in the estimation of a Mineral Resource.
The Exploration Target is not to be considered in any way to represent a Mineral Resource or Ore Reserve.
Table 1 Verkhuba Exploration Target estimate for open pit and underground mining methods
Mining method
Open pit
Underground
Total
Tonnes
(kt)
5,000 - 6,000
14,000 - 17,000
19,000 - 23,000
Zn
(%)
0.5 - 0.8
1.2 - 1.6
1.0 - 1.4
Cu
(%)
1.4 - 1.8
0.8 - 1.2
1.0 - 1.4
Pb
(%)
0.1 - 0.2
0.1 - 0.2
0.1 - 0.2
Notes:
·
This is an Exploration Target and should not be considered to be a Mineral Resource
·
The Exploration Target assumes an open pit mining method with marginal cut-off of 0.38% Cu equivalent
and underground mining method with the marginal cut-off of 0.86% Cu equivalent
·
A nominal dry density values of 3.0 t/m3 was assumed to be appropriate for the style of mineralisation
·
Cu equivalent was calculated using the following metal prices: 3,050 US$/t for Zn, 9,000 US$/t for Cu, 2,250
US$/t for Pb
·
Tonnage is reported on dry basis
Following the Exploration Target, AMC made the following findings:
·
The quality of procedures for the historical data collection used for the Exploration Target
estimate is believed to be of sufficient standard
·
The Exploration Target for the Verkhuba Deposit was prepared using data, geological
interpretation and understanding, and estimation practices that are appropriate for the style
of mineralisation
·
The cut-off grades which have been calculated for reporting open pit and underground
Exploration Target are considered reasonable and based on justifiable assumptions and
parameters
·
The Exploration Target has potential to be developed via open pit and underground mining
methods, and it has been delineated and reported in accordance with the JORC Code
·
Further verification and infill drilling are required to upgrade the current Exploration Target
to a Mineral Resource
*Note: Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves. The JORC Code, 2012
Edition. Prepared by: The Joint Ore Reserves Committee of The Australasian Institute of Mining and Metallurgy, Australian
Institute of Geoscientists and Minerals Council of Australia (JORC).
Next Steps
As part of ongoing studies, AMC recommend that ten new drillholes, twined to historical drillholes, should be
drilled as verification holes to support further mineral resource estimation and classification. It is the intention of
the Company to drill these holes in summer 2023 to expediate the estimation of JORC- compliant resources over
the Verkhuba Deposit.
Upon conversion to JORC-compliant resources, East Star will be able to undertake a Scoping Study on both the
open pit and underground development scenarios to confirm the potential economics of the project. East Star
hopes to complete and publish the results of this work by the end of 2023.
The Company will abide by industry standard QA/QC protocols for quality assurance and intend on conducting
geotechnical logging on all core for the purpose of saving time and money on the subsequent stages of feasibility
assessment.
A map of a city Description automatically generated with medium confidence
Figure 2 Arial view of mineralisation with OP outline and planned drillholes (yellow)
Rudny Altai Region
The Rudny Altai region is one of the largest VMS provinces in the world, part of the Central Asian Orogenic Belt.
The Company's newest 1794-EL, 1795-EL (containing the Verkhuba Deposit) and 1799-EL licences are located
adjacent to the Company's existing 847-EL and 914-EL licences (together, the "Licences"). Administratively, the
Licences are within the Shemonaikha District and are extraordinarily well connected to infrastructure. The regional
centre of Ust-Kamenogorsk is located 45 km, and its international airport is located 35 km, southeast of the
Licences. The railway connecting Ridder (Kazzinc Mine) and Tomsk cities crosses the Licences from the south to
the northwest with two railway stations located on the territory of the Licences. There is a network of dirt roads
within the Licences that are suitable for driving all year round. A hard-surfaced road from Ust-Kamenogorsk to
Shemonaikha crosses the western part of the Licences.
The area is characterised by moderately hilly terrain with elevations ranging between 270 m and 630 m above the
mean sea level.
For further information visit the Company's website at www.eaststarplc.com, or contact:
East Star Resources Plc
Alex Walker, Chief Executive Officer
Tel: +44 (0)20 7390 0234 (via Vigo Consulting)
Peterhouse Capital Limited (Corporate Broker)
Duncan Vasey / Lucy Williams
Tel: +44 (0) 20 7469 0930
Vigo Consulting (Investor Relations)
Ben Simons / Peter Jacob
Tel: +44 (0)20 7390 0234
About East Star Resources Plc
East Star Resources is focused on the discovery and development of strategic minerals required for the energy
revolution. With an initial nine licences covering 1,321.5 km² in three mineral rich districts of Kazakhstan, East Star
is undertaking an intensive exploration programme, applying modern geophysics to discover minerals in levels
that were not previously explored. The Company also intends to further expand its licence portfolio in
Kazakhstan. East Star's management are based permanently on the ground, supported by local expertise, and
joint ventures with the state mining company.
Follow us on social media:
LinkedIn: https://www.linkedin.com/company/east-star-resources/
Twitter: https://twitter.com/EastStar_PLC
The person who arranged for the release of this announcement was Alex Walker, CEO of the Company.
Competent Persons Statement
The information in this Report that relates to the Exploration Target is based on and fairly represents information
which has been compiled by Mr Dmitry Pertel who is a member of the Australian Institute of Geoscientists. Mr
Pertel has sufficient experience relevant to the style of mineralisation and type of deposit under consideration
and to the activity that is being undertaken to qualify as a Competent Person, as defined in the 2012 Edition of
the "Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves". Mr Pertel is a
full-time employee of AMC Consultants Pty Ltd..
The information in this Report that relates to QAQC (JORC Code Table 1 Sections 1 and 2) is based on and fairly
represents information which has been compiled by Dr Mikhail Tsypukov who is a Fellow of the Institute of
Materials, Minerals and Mining (UK). Dr Tsypukov has sufficient experience relevant to the style of mineralisation
and type of deposit under consideration and to the activity that is being undertaken to qualify as a Competent
Person, as defined in the 2012 Edition of the "Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves". Mr Tsypukov is an independent Consulting Geologist (not associated with AMC)
and has consented to the inclusion of the matters in this report based on his information in the form and context
in which it appears.
JORC Table 1. Verkhuba Deposit
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Sampling Techniques
¡ Nature and quality of sampling ¡ The deposit was explored by drilling producing
(eg cut channels, random
59 and 76 mm diameter core. Sampling was
chips, or specific specialised
performed only on mineralised intervals
industry standard
identified by visual core logging and
measurement tools
downhole geophysics (X-ray radiometric
appropriate to the minerals
and/or electric downhole logging).
under investigation, such as
¡ Mineralised core of different mineralogy was
down hole gamma sondes,
sampled separately at intervals ranging
or handheld XRF
from 0.1 to 2.0 m in length.
instruments, etc). These
¡ 59 mm core was sampled in full, 76 mm core
examples should not be
was cut in half, one half of core was
taken as limiting the broad
sampled for laboratory studies.
meaning of sampling.
¡ Include reference to measures
taken to ensure sample
representivity and the
appropriate calibration of
any measurement tools or
systems used.
¡ Host rocks in hanging wall and footwall of
mineralisation were sampled by 1 m long
samples, 2-3 samples were collected from
each contact.
¡ Non-mineralised core was sampled by 10 m
long composite core samples by collecting
¡ Aspects of the determination of
mineralisation that are
Material to the Public Report.
rock chips every 10 cm of core for rock
chemical and mineralogical studies.
¡ Drill type (eg core, reverse
circulation, open-hole
hammer, rotary air blast,
auger, Bangka, sonic, etc)
and details (eg core
diameter, triple or standard
tube, depth of diamond
tails, face-sampling bit or
other type, whether core is
oriented and if so, by what
method, etc).
¡ Double barrel wireline system was used in
Exploration Target definition drilling.
¡ In case of low core recovery (<50%) sampling
¡ In cases where 'industry
intervals were increase to 3 m to provide
standard' work has been
enough sampling material for chemical
done this would be relatively
studies.
simple (eg 'reverse
In the opinion of the Competent Person, the
circulation drilling was used
sampling techniques were appropriate for the
to obtain 1 m samples from
geology, scale of deposit, and are of an
which 3 kg was pulverised to
acceptable standard for the purpose of data
produce a 30 g charge for
used in estimating an Exploration Target.
fire assay'). In other cases,
more explanation may be
required, such as where
there is coarse gold that has
inherent sampling problems.
Unusual commodities or
mineralisation types (eg
submarine nodules) may
warrant disclosure of
detailed information.
Drilling Techniques
¡ Upper 10-20 m transported deposits were
drilled by 132 mm diamond drill bit,
followed by 112 mm bit up to depth of 3570 m below the surface. After casing of drill
hole by 89 mm casing pipes, the drilling was
continued by 76 mm bit (core diameter 57
mm), followed by 59 mm drill bit (core
diameter 42 mm).
¡ Most of the mineralised intervals were drilled
with 59 mm drill bits.
In the opinion of the Competent Person, the
drilling techniques are suitable for estimating
Exploration Target: the core sizes are
appropriate, but the standards of work
completed in the Soviet era should be
quantified and compared to the planned
verification drill programme. The data obtained
using the older drilling techniques is acceptable
for the definition of an Exploration Target.
Drill Sample
Recovery
¡ Method of recording and
assessing core and chip
sample recoveries and
results assessed.
¡ On undisturbed core, the recovery was
estimated by dividing of core length by the
length of drilling run reduced to 100%. Most
of the core was presented by broken and
fragmented core and its recovery was
measured using weight method.
¡ Measures taken to maximise
sample recovery and ensure
representative nature of the ¡ To increase core recovery on mineralised
samples.
intervals the length of drilling runs was
reduced to 1 m and drill bit load was also
¡ Whether a relationship exists
reduced.
between sample recovery
and grade and whether
¡ Core recovery on mineralised intervals was
sample bias may have
reported above the limit of 70% and above
occurred due to preferential
60% within the bioherm sequence.
loss/gain of fine/coarse
material.
¡ There were no requirements on core recovery
on non-mineralised intervals and host
rocks, where core recovery varied within 2340% (1987-1990).
¡ No relationship between sample recovery and
grade was reported nor it was apparent.
In the opinion of the Competent Person, the
drill sample recoveries are suitable for data
used in estimating an Exploration Target.
Logging
Sub-sampling
Techniques and
Sample Preparation
¡ Whether core and chip samples ¡ All drill holes were geologically logged except
have been geologically and
upper sections of drill holes with
geotechnically logged to a
transported sediments, however only
level of detail to support
limited original information from geological
appropriate Mineral
archives has been obtained to date.
Resource estimation, mining
¡ No results of historical geotechnical logging
studies and metallurgical
are available.
studies.
¡ Historical logging was qualitative, in many
¡ Whether logging is qualitative
cases rock nomenclature is not confirmed
or quantitative in nature.
by rock chemistry and by other exploration
Core (or costean, channel,
campaigns.
etc) photography.
¡ No core photos were taken during historical
¡ The total length and percentage
exploration.
of the relevant intersections
In the opinion of the Competent Person, the
logged.
available geological logging is sufficient to
support estimate of an Exploration Target.
¡ If core, whether cut or sawn and ¡ 57 mm core was cut along the core axe, half
whether quarter, half or all
core subsamples were taken for control
core taken.
purposes. 42 mm core was sampled in full,
no geological duplicates were available for
¡ If non-core, whether riffled, tube
control purposes.
sampled, rotary split, etc
and whether sampled wet or ¡ Sample preparation was robust and included
dry.
all necessary procedures, including multiple
crushing controlled by sieving, staged size
¡ For all sample types, the nature,
reduction, pulverizing and collection of one
quality and appropriateness
analytical sample and three duplicates of
of the sample preparation
sufficient weight for analytical studies.
technique.
¡ Sample size was appropriate to the grain size
¡ Quality control procedures
of the sampling material.
adopted for all subsampling stages to
The Competent Person's opinion that the
maximise representivity of
subsampling techniques and sample
samples.
preparation were suitable for data used in
estimating an Exploration Target.
¡ Measures taken to ensure that
the sampling is
representative of the in situ
material collected, including
for instance results for field
duplicate/second-half
sampling.
¡ Whether sample sizes are
appropriate to the grain size
of the material being
sampled.
Quality of assay data
¡ The nature, quality and
¡ Atomic absorption spectral analysis was used
and laboratory tests
appropriateness of the
assaying and laboratory
procedures used and
whether the technique is
considered partial or total.
¡ For geophysical tools,
spectrometers, handheld
XRF instruments, etc, the
parameters used in
determining the analysis
including instrument make
and model, reading times,
calibrations factors applied
and their derivation, etc.
¡ Nature of quality control
procedures adopted (eg
standards, blanks,
duplicates, external
laboratory checks) and
whether acceptable levels of
accuracy (ie lack of bias)
and precision have been
established.
Verification of
Sampling and
Assaying
¡ The verification of significant
intersections by either
independent or alternative
company personnel.
¡ The use of twinned holes.
for determination of Cu, Pb and Zn. Fire
assay analysis with atomic absorption
finish was use for determination of Au and
Ag.
¡ Analytical test results for Cu, Pb and Zn on
main and duplicate samples performed in
main and umpire laboratories
demonstrated discrepancy within the
acceptable limits.
¡ There is no available information on internal
QAQC procedures in main and umpire
laboratories.
The Competent Person is satisfied that the
overall quality of the assay results is
acceptable and fit for the purpose of
estimating an Exploration Target.
¡ No verification drilling has been performed by
ESR at this stage.
¡ No twinning of historical drill holes was
performed by ESR.
¡ Limited primary historical data as core
¡ Documentation of primary
lithological and structural logs, drill hole
data, data entry procedures,
inclination etc. is available by the time of
data verification, data
preparation of the report.
storage (physical and
¡ Location of mineralised intervals can be
electronic) protocols.
corrected after obtaining of historical
¡ Discuss any adjustment to
topographic survey results, drill hole logs
assay data.
and on-site inspection.
No control or verification results were
available at the time of reporting; thus
estimated grades and tonnes were not
classified.
Location of Data
Points
¡ Accuracy and quality of surveys ¡ Location and deviation of historical drill holes
used to locate drill holes
was digitised from georeferenced geological
(collar and down-hole
sections and maps at scale 1:10,000, which
surveys), trenches, mine
is considered as appropriate for Exploration
workings and other locations
Target mineral inventory.
used in Mineral Resource
¡ By the time of preparation of the report no
estimation.
historical drill hole logs with collar
¡ Specification of the grid system
coordinates were available. ESR is in the
used.
process of obtaining this information from
geological archives.
¡ Quality and adequacy of
topographic control.
¡ Topography of the deposit area was
presented as digital terrane model with
sufficient resolution which is considered as
appropriate for Exploration Target mineral
inventory.
The Competent Person is satisfied that the
location of data points is fit for the purpose
of estimating an Exploration Target.
Data Spacing and
Distribution
¡ Data spacing for reporting of
Exploration Results.
¡ Whether the data spacing and
distribution is sufficient to
establish the degree of
geological and grade
continuity appropriate for
the Mineral Resource and
Ore Reserve estimation
procedure(s) and
classifications applied.
¡ Whether sample compositing
has been applied.
¡ Data spacing is appropriate for delineation of
Exploration Target assessment of volume
of mineralised material and metal
endowment and grades.
¡ Historical data spacing and distribution is
sufficient to establish mineralised bodies,
continuity of lithology and grade
appropriate for delineation of Exploration
Target. Verification drilling and twinning of
some drill holes are required for
subsequent Mineral Resource Estimate in
Inferred and Indicated categories.
¡ Exploration grid includes 97 diamond holes
drilled with 200 m by 200 m to 100 m by 100
m spacing.
¡ Most mineralised zones do not outcrop, but
some of them do outcrop. Mineralised
bodies were traced to a depth exceeding
800 m from the surface, using adit levels
and inclined core drillholes. Drillholes were
located along the profiles, oriented across
the mineralised bodies strike, the profiles
strike at 100-105º.
The Competent Person is satisfied that
data spacing is appropriate for estimating
an Exploration Target.
Orientation of Data
in relation to
Geological Structure
¡ Whether the orientation of
¡ Most of the drill holes were sub-vertical,
sampling achieves unbiased
intersecting of flat lying lithology at steep
sampling of possible
angles. Thus, no correction of width of
structures and the extent to
mineralised intersections was applied which
which this is known,
is considered as appropriate to the
considering the deposit type.
considered deposit type.
¡ If the relationship between the ¡ The sampling orientation was appropriate for
drilling orientation and
the reliable sampling of the identified
the orientation of key
structures, considering the mineralisation
mineralised structures
type.
is considered to have
¡ Drilling profiles were oriented across the
introduced a sampling
mineralisation.
bias, this should be
assessed and reported ¡ The flat lying mineralised bodies were sampled
by inclined or vertical drillholes, oriented
if material.
across the mineralised zone strike.
¡ Sampling bias from the orientation of the
drilling was not identified.
The Competent Person is satisfied that
orientation of data in relation to geological
structure is appropriate for estimating an
Exploration Target.
Sample Security
¡ The measures taken to ensure
sample security.
¡ Not appropriate. All historical core and
laboratory samples were disposed of
shortly after completion of exploration
programmes.
Audits or Reviews
¡ The results of any audits or
reviews of sampling
techniques and data.
¡ As far as Competent Person aware, there were
no audits or reviews of sampling
techniques and data related to Verkhuba
deposit performed by any third party.
Section 2 Reporting of Exploration Results
(Criteria listed in the preceding section also apply to this section)
Mineral
¡ Type, reference
Tenement and
name/number,
Land Tenure
location and
Status
ownership
including
agreements or
material issues
with third
parties such as
joint ventures,
partnerships,
overriding
royalties, native
title interests,
historical sites,
wilderness or
national park
and
environmental
settings.
¡ The security of the
tenure held at
the time of
reporting along
with any known
impediments to
obtaining a
licence to
operate in the
area.
¡ Verkhuba deposit is located in the eastern part of exploration licence
1795-EL, owned by Discovery Ventures Kazakhstan Ltd. The licence was
issued on 27 July 2022 for initial period of 6 years with a possibility of
further five years extension subject to reduction of the licence area by
40%. The licence has an area of 37.1 km2 and contains VHMS deposits
Pokrovskoe-2 (mined out in 1960-1970th ) and Verkhuba and several
VHMS occurrences. No native title interests, historical sites, wilderness
or national park and environmental setting identified by ESR
appointed environmental consultants.
¡ Discovery Ventures Kazakhstan Ltd is a 100% owned entity of East Star
Resources.
¡ Ministry of Industry and Infrastructural Development of the Republic of
Kazakhstan does not carry any negotiations with any other party in
respect of the property. All required documents including Exploration
programme, Environmental impact assessment (EIA) and enhanced
technical and economic calculations studies are completed by ESR and
approved by the Kazakhstan mining authorities allowing ESR to
perform exploration on the property.
¡ According to Kazakh mining legislation, exploration licence can be
converted to mining licence after completion of exploration