East Star Resources - Outstanding Historical Drill Results - Rulikha
Released
Released
Announcement PDF
RNS Number : 3941G
East Star Resources PLC
28 April 2025
28 April 2025
East Star Resources Plc
("East Star" or the "Company")
Outstanding Historical Polymetallic Drill Results at Rulikha Deposit
Priority 2025 drill target shown to have thick, high-grade intervals proximal to geophysical anomalies
East Star Resources Plc (LSE:EST), which is exploring for copper and gold in Kazakhstan, is pleased to announce
that it has begun the digitisation process of historical data from theRulikha Deposit, reported as 14.3Mt @ 1.2%
Cu, 3.5% Zn, 0.28 g/t Au, and 13.5 g/t Ag.
The historical reports demonstrate outstanding grades, including an 81.2m ore grade interval, within East Star's
currently awarded licence area and proximal to a distinct electromagnetic anomaly and three Induced
Polarisation ("IP") anomalies to the north and northeast of these intersections.
Highlights:
· DH_353 64.3m @ 2.7% Cu from 22.9m and 16.9m @ 1.25% Cu from 87.2m (for an 81.2m interval)
· DH_356 12.1m @ 12.1m at 10.5% Zn and 4.9% Cu, 0.44g/t Au and 17.2g/t Ag from 34.3m
· DH_319 12.3m @ 6.1% Zn and 0.4% Cu from 112.1m
· DH_34A 7.0m @ 6.1% Zn from 475.8m
Alex Walker, East Star CEO, commented:
"These outstanding results showing thick, high-grade intervals, bode well for these high impact Rulikha targets and I am
very much looking forward to getting the drill rig turning on these targets this summer. Our team's incredible efforts over
the winter break, finding and digitising this historical data to prepare for our 2025 geophysics and drilling programme,
has been remarkable.
We have also developed an exceptional relationship with the District of Shemonaikha, the municipality where Rulikha and
Verkhuba are situated, over the last four years and are very excited to continue to grow that relationship and find more
resources to prolong the regional mining operations which have been going since 1749. I could not be prouder of our team
and more excited about the opportunities in front of us in 2025 and the geological opportunities like this which Kazakhstan
has to offer."
Figure1Location of drill holes on East Star's awarded exploration licence showing the IP and EM anomalies
Notwithstanding the potentially economic nature of these drill results, the geological knowledge gained from the
digitisation process continues to reinforce the geophysical anomalies, discussed in the announcement dated 24
April 2025. An infill IP survey is currently underway over these target areas with the Talovskoye survey complete
and initial interpretation underway, and the survey over the eastern extension of the Rulikha prospect expected
to finish by next week. The results of these surveys will inform the priority of the drilling programme in 2025 and
East Star plans to drill test these geophysical anomalies this year.
Once the IP programme in the East Region is completed, the contractors will relocate to the Snowy epithermal
gold anomaly to complete 4 x 1.6km IP lines at 200m spacing over the main pyrophyllite alteration and gold and
silver anomaly to test for chargeability and resistivity anomalies resembling an epithermal sulphide gold target or
porphyry system.
Further Information
History of the Rulikha Deposit
The Rulikha Depositand geophysical targets are situated about 33km northwest from East Star's 100% owned
Verkhuba Deposit (JORC MRE of 20.3Mt @ 1.16% copper, 1.54% zinc and 0.27% lead).Located within the
Rulikhinsko-Vydrikhinskoe ore field in the Shemonaikha district of East Kazakhstan, is a volcanogenic massive
sulfide (VMS) polymetallic deposit primarily explored for zinc, copper and lead. The deposit was part of a broader
geological exploration effort in the region, conducted by the East Kazakhstan Geological Exploration Expedition
under the Ministry of Geology of the USSR and later the Republic of Kazakhstan.
Exploration of the Rulikha Deposit began in the mid-20th century, with significant archival references to work
conducted from the 1940s to the 1980s, followed by detailed prospecting from 1989-1992:
· 1940 - 1950s: Early prospecting by the Shemonaikha Party of the Altai identified polymetallic mineralisation.
A consolidated report in 1957 (Utrobin et al.) calculated reserves for the Rulikhinskoye (Rulikha) deposit.
· 1960s-1970s: Geological and geophysical work by the Shemonaikha Geological Reconnaissance Party (GRP)
and Priirtyshskaya Party refined the geological structure and mineral potential. The 1979 report by
Abdulmenov and Golubtsov focused on the Buzanikhinsky area, adjacent to Rulikha.
·
1978-1983: Detailed prospecting by the Minsk and Ubin GRPs of the Shemonaikha GRE targeted the
Rulikhinsko-Vydrikhinsky and Talovsko-Rulevsky areas, further delineating mineralisation.
· 1989-1992: The focus of the provided report, conducted under Geological Task No. 1, involved deep drilling
to assess the ore-bearing potential of deep horizons (up to 1000-1200 m). Work was halted in January 1991
due to overlapping exploration by the Altai Geological-Geophysical Expedition but resumed for report
preparation in 1992.
The 1989-1992 exploration programme included significant drilling and sampling efforts:
· Total Drilling - 6,785 linear metres of core drilling across 12 exploration boreholes. Drilling grid for Rulikha
Deposit: 200 x 100 m for C2 category resources (GKZ resource categorisation not typically used in modern
resource estimates), 400 x 100 m or 300 x 200 m for P1 category.
· Geochemical Sampling - 737 geochemical samples collected.
· Core Sampling - 16 core samples analysed.
· Geophysical Logging: - 6,607 linear metres of gamma logging.
The results of the historical exploration found that the Rulikha Deposit hosts VMS-polymetallic mineralisation,
primarily copper, zinc and lead, with some gold and silver. Mineralisation is localised in tuffs, volcanic sediments
and extrusive units from the Middle-Upper Devonian boundary. Mineralisation is associated with vein-type and
stratiform ores. Metallurgical or processing test work for the Rulikha Deposit has not been completed to date.
East Star Resources Plc
Alex Walker, Chief Executive Officer
Tel: +44 (0)20 7390 0234 (via Vigo Consulting)
SI Capital (Corporate Broker)
Nick Emerson
Tel: +44 (0)1483 413 500
Vigo Consulting (Investor Relations)
Ben Simons / Peter Jacob
Tel: +44 (0)20 7390 0234
About East Star Resources Plc
East Star Resources is focused on the discovery and development of copper and gold in Kazakhstan. East Star's
management are based permanently on the ground, supported by local expertise. The Company is pursuing
three exploration strategies:
·
A Volcanogenic Massive Sulphide (VMS) discovery with a maiden JORC MRE of 20.3Mt @ 1.16% copper,
1.54% zinc and 0.27% lead, in an infrastructure-rich region, amenable to a low capex development
· Copper porphyry and epithermal gold exploration, with multiple opportunities for Tier 1 deposits, initially
supported by an initial US$500k grant from BHP Xplor in 2024.
· Sediment-hosted copper exploration with Getech where the initial targeting strategy is at no cost to East
Star.
Visit our website:
www.eaststarplc.com
Follow us on social media:
LinkedIn: https://www.linkedin.com/company/east-star-resources/
X (formerly Twitter): https://twitter.com/EastStar_PLC
Subscribe to our email alert service to be notified whenever East Star releases news:
www.eaststarplc.com/newsalerts
The person who arranged for the release of this announcement was Alex Walker, CEO of the Company.
Competent Person Statement
Scientific or technical information in this disclosure related to exploration was reviewed by Dr
Tremain Woods, a full-time employee of Discovery Ventures Kazakhstan Ltd, a 100% owned
subsidiary of East Star Resources PLC. Dr Woods is a member in good standing with the
Geological Society of South Africa. He has sufficient experience that is relevant to the commodity,
style of mineralisation or type of deposit under consideration and activity which he is undertaking
to qualify as a Competent Person under the JORC code (2012 Edition).
Table 1 Historic Drill Results
Hole ID
Year
Azimuth
DH_101
1983
86
DH_101
1983
DH_101
1983
DH_101
Dip
Depth
(m)
Z
From
(m)
To
(m)
Thickness
(m)
Cu
(%
X
Y
-89
569205.1
5594002
450
470.9
92.7
93.7
1
86
-89
569205.1
5594002
450
470.9
137.5
139.5
2
86
-89
569205.1
5594002
450
470.9
141.5
146.5
5
1983
86
-89
569205.1
5594002
450
470.9
156.5
166.5
10
DH_101
1983
86
-89
569205.1
5594002
450
470.9
170.5
174.5
4
DH_101
1983
86
-89
569205.1
5594002
450
470.9
176.5
182.5
6
DH_101
1983
86
-89
569205.1
5594002
450
470.9
215.4
221.4
6
DH_101
1983
86
-89
569205.1
5594002
450
470.9
225.4
238.4
13
DH_101
1983
86
-89
569205.1
5594002
450
470.9
239.4
241.4
2
DH_101
1983
86
-89
569205.1
5594002
450
470.9
245.4
247.4
2
DH_270
1983
38
-87
568773.6
5593831
355
604
107.2
107.8
0.6
DH_270
1983
38
-87
568773.6
5593831
355
604
132.5
133.2
0.7
DH_270
1983
38
-87
568773.6
5593831
355
604
135.6
137.3
1.7
DH_270
DH_271
(20/78)
DH_271
(20/78)
DH_271
(20/78)
1983
38
-87
568773.6
5593831
355
604
139.3
147.8
8.5
1983
254
-90
569119.2
5593696
450
1048
168
174
6
1983
254
-90
569119.2
5593696
450
1048
273.3
277
3.7
1983
254
-90
569119.2
5593696
450
1048
288.7
289.7
1
DH_292
1983
339
-86
568445.2
5594497
359
858
582
602
20
DH_2A
1992
217
-77
571420.2
5596046
490
422
145
155
10
DH_2A
1992
217
-77
571420.2
5596046
490
422
205
225
20
DH_2A
1992
217
-77
571420.2
5596046
490
422
255
275
20
DH_2A
1992
217
-77
571420.2
5596046
490
422
378
380
2
DH_303
1992
60
-87
570023.1
5595124
419
508
296.5
304.6
8.1
DH_310
1992
68
-86
570484.8
5592706
359
545.1
427.3
431
3.7
DH_318
1992
44
-87
571316.9
5593147
374
562
468.3
470.8
2.5
DH_318
1992
44
-87
571316.9
5593147
374
562
470.8
472
1.2
DH_319
1992
31
-86
569710.5
5593690
364
274
112.1
124.4
12.3
DH_319
1992
31
-86
569710.5
5593690
364
274
128.8
131.1
2.3
DH_319
1992
31
-86
569710.5
5593690
364
274
211
211.7
0.7
DH_322
1992
155
-90
569735.6
5594953
403
591
6
15
9
DH_322
1992
155
-90
569735.6
5594953
403
591
135
139
4
DH_322
1992
155
-90
569735.6
5594953
403
591
176
186
10
DH_322
1992
155
-90
569735.6
5594953
403
591
253
263
10
DH_322
1992
155
-90
569735.6
5594953
403
591
282
292
10
DH_322
1992
155
-90
569735.6
5594953
403
591
417
421
4
DH_322
1992
155
-90
569735.6
5594953
403
591
498
505
7
DH_323
1992
149
-89
566533.5
5596287
402
709
296.5
304.6
8.1
DH_323
1992
149
-89
566533.5
5596287
402
709
395
399
4
DH_332
1992
61
-88
569633.7
5593579
353
625
204
207
3
DH_332
1992
61
-88
569633.7
5593579
353
625
215
216
1
DH_332
1992
61
-88
569633.7
5593579
353
625
223
224
1
DH_332
1992
61
-88
569633.7
5593579
353
625
224
225
1
DH_332
1992
61
-88
569633.7
5593579
353
625
230
231
1
DH_332
1992
61
-88
569633.7
5593579
353
625
231
245
14
DH_332
1992
61
-88
569633.7
5593579
353
625
255
257
2
DH_332
1992
61
-88
569633.7
5593579
353
625
257
259
2
DH_332
1992
61
-88
569633.7
5593579
353
625
259
261
2
DH_332
1992
61
-88
569633.7
5593579
353
625
267
271
4
DH_332
1992
61
-88
569633.7
5593579
353
625
271
273
2
DH_332
1992
61
-88
569633.7
5593579
353
625
273
275
2
DH_332
1992
61
-88
569633.7
5593579
353
625
287
289
2
DH_332
1992
61
-88
569633.7
5593579
353
625
291
299
8
DH_332
1992
61
-88
569633.7
5593579
353
625
299
312
13
DH_332
1992
61
-88
569633.7
5593579
353
625
399
400
1
DH_332
1992
61
-88
569633.7
5593579
353
625
420.8
422.8
2
DH_332
1992
61
-88
569633.7
5593579
353
625
444.5
446.5
2
DH_332
1992
61
-88
569633.7
5593579
353
625
446.5
448.5
2
DH_333
1992
57
-86
571285.2
5595927
497
450
128.5
129.5
1
DH_333
1992
57
-86
571285.2
5595927
497
450
155
156
1
DH_333
1992
57
-86
571285.2
5595927
497
450
269
270
1
DH_334
1992
48
-83
571095.4
5595475
480
452
436
438.5
2.5
DH_34
1992
36
-90
568753
5594451
389
291.8
175.9
177.9
2
DH_34
1992
36
-90
568753
5594451
389
291.8
177.9
179.9
2
DH_340
1992
24
-88
570670
5592620
355
617.2
605.2
606.4
1.2
DH_342
1992
36
-86
570936.3
5595156
494
700
418
418.25
0.3
DH_342
DH_343
(8/81)
DH_343
(8/81)
DH_343
(8/81)
1992
36
-86
570936.3
5595156
494
700
475.25
476
0.75
1983
21
-90
569228.3
5594333
450
723
292.6
294.6
2
1983
21
-90
569228.3
5594333
450
723
300.6
302
1.4
1983
21
-90
569228.3
5594333
450
723
371.3
373
1.7
DH_345
1992
347
-78
570918.8
5596065
456
628
170
172.5
2.5
DH_34A
1992
55
-89
570304.9
5592789
357
678
349
349.4
0.4
DH_34A
1992
55
-89
570304.9
5592789
357
678
394
395.3
1.3
DH_34A
1992
55
-89
570304.9
5592789
357
678
460
465
5
DH_34A
1992
55
-89
570304.9
5592789
357
678
465
467.4
2.4
DH_34A
1992
55
-89
570304.9
5592789
357
678
467.4
475.8
8.4
DH_34A
1992
55
-89
570304.9
5592789
357
678
475.8
482.8
7
DH_353
1992
72
-89
569595.2
5593935
373
127
22.9
87.2
64.3
DH_353
1992
72
-89
569595.2
5593935
373
127
87.2
104.1
16.9
DH_356
1992
53
-88
569536
5593888
366
140
34.3
46.4
12.1
DH_357
1992
64
-89
569681
5593966
376
266
163.7
164.5
0.8
DH_357
1992
64
-89
569681
5593966
376
266
164.5
166.8
2.3
DH_357
1992
64
-89
569681
5593966
376
266
234
235.6
1.6
DH_357
1992
64
-89
569681
5593966
376
266
239
241
2
DH_357
1992
64
-89
569681
5593966
376
266
253.6
255.6
2
DH_35A
1992
18
-83
570285.7
5592508
384
865
426
428
2
DH_35A
1992
18
-83
570285.7
5592508
384
865
461
463
2
DH_366
1992
43
-78
569657.5
5593146
583
526.7
265.6
266.6
1
DH_366
1992
43
-78
569657.5
5593146
583
526.7
266.6
275
8.4
DH_366
1992
43
-78
569657.5
5593146
583
526.7
302.4
303.7
1.3
DH_368
1992
45
-90
569211.9
5594176
363
485
249.5
250.5
1
DH_369
1992
54
-79
569394.4
5594327
365
490.4
359.5
360.1
0.6
DH_370
1992
54
-87
569714.4
5593241
580
400
240.4
247.9
7.5
DH_374
1992
36
-88
569094.1
5593910
369
682
597.7
599.7
2
DH_374
1992
36
-88
569094.1
5593910
369
682
606
610.2
4.2
DH_375
1992
36
-90
569010.8
5594089
383
207.9
26.3
29
2.7
DH_375
1992
36
-90
569010.8
5594089
383
207.9
29
32.8
3.8
DH_375
1992
36
-90
569010.8
5594089
383
207.9
116
118.5
2.5
DH_375
1992
36
-90
569010.8
5594089
383
207.9
118.5
120
1.5
DH_376
1992
36
-89
568904.9
5593999
371
520
170.8
172.8
2
DH_378
1992
35
-84
568627.1
5594255
400
705
552.7
558.1
5.4
DH_380
1992
36
-89
568812.3
5593901
359
414
41.5
42.5
1
DH_380
1992
36
-89
568812.3
5593901
359
414
61.5
62
0.5
DH_380
1992
36
-89
568812.3
5593901
359
414
62
64
2
DH_380
1992
36
-89
568812.3
5593901
359
414
147
148
1
0
DH_381
1992
19
-90
569074.3
5593787
372
636
44.3
46.2
1.9
DH_381
1992
19
-90
569074.3
5593787
372
636
46.2
50.6
4.4
DH_3A
1992
251
-82
571270.1
5596083
500
405
8
45
37
DH_3A
1992
251
-82
571270.1
5596083
500
405
70
78
8
DH_3A
1992
251
-82
571270.1
5596083
500
405
152
156
4
DH_3A
1992
251
-82
571270.1
5596083
500
405
226
234
8
DH_6
1992
107
-75
571102
5596106
539
62.1
0
13
13
DH_6
1992
107
-75
571102
5596106
539
62.1
30.6
34.75
4.15
DH_76
1983
249
-89
569239.5
5594460
450
416.7
275.15
276.35
1.5
DH_76
1983
249
-89
569239.5
5594460
450
416.7
397
398
1
DH_8
1949
112
-72
571224
5595871
496
218.21
19.5
20.1
0.6
DH_8
1949
112
-72
571224
5595871
496
218.21
158.73
160
1.27
DH_8
1949
112
-72
571224
5595871
496
218.21
161.63
162.93
1.3
DH_8
1949
112
-72
571224
5595871
496
218.21
168.88
169.38
0.5
DH_8
1949
112
-72
571224
5595871
496
218.21
169.38
169.48
0.1
Table 2 - JORC Code, 2012 Edition
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling
techniques
· Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
· Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Commentary
·
Samples were taken from diamond drill core through su
intervals.
·
Sampling intervals ranged from 0.1 m to over 1.0m
·
Sample quality was ensured by a GKZ standard calculat
spectral analyses were representative
·
A total of 599 meters of core was sampled for the Rulikh
·
Core samples were prepared by the geological expeditio
crushing and milling the samples (the size fractions are
standard fractions), then analysed with X-ray spectral t
·
No core is available for verification sampling
· Aspects of the determination of mineralisation
that are Material to the Public Report.
· In cases where 'industry standard' work has been
done this would be relatively simple (e.g.
'reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay'). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
Drilling
techniques
Drill sample
recovery
· Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
· Drilling was conducted using standard HQ sized diamond dr
· Method of recording and assessing core and chip
sample recoveries and results assessed.
· Core recovery was an average of 42%, the total range was fro
· Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
· Various drilling campaigns were conducted by geological exp
· The drill holes purpose ranged from geochemical sampling u
are not included in the data for this announcement) to dee
with assay data through the Rulikha deposit were included
· Recovery logs are unavailable for drill hole data base, so the
and grade has not been evaluated.
Criteria
JORC Code explanation
Commentary
· Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
Logging
· Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
· Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
· Geologists from the various companies and expeditions com
· The logging was approved by the committee for geology.
· Sections and plan maps were available to verify geology and
· East Star geologists were able to confirm the geology at surfa
scale of 1:2000 in 2024.
· Approximately 80% of the logged sections were available for
and additional information has been requested to inform fu
· The total length and percentage of the relevant
intersections logged.
Sub-sampling
techniques
and sample
preparation
· If core, whether cut or sawn and whether quarter,
half or all core taken.
· If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
· Half core samples were collected for processing.
· Sub sampling techniques aren't clearly recorded in the repor
· For all sample types, the nature, quality, and
appropriateness of the sample preparation
technique.
· Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
· Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
· Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of
assay data
and
laboratory
tests
· The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
· For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
· Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and precision
have been established.
Verification of
sampling and
assaying
· The verification of significant intersections by
either independent or alternative company
personnel.
· The use of twinned holes.
· Documentation of primary data, data entry
procedures, data verification, data storage
(physical and electronic) protocols.
· Discuss any adjustment to assay data.
· The samples were analyzed using X-ray spectral analysis, wh
homogeneous samples to ensure accurate detection of ele
· It's unclear if Au and Ag analyses were conducted on all samp
· The preparation would have been tailored to produce a sam
spectrometer, typically involving pressing the powdered sa
a glass bead for analysis, though the reports do not specify
· X-ray spectral techniques were commonly used in historical e
techniques have been subsequently replaced by modern a
they are generally viewed as having produced accurate resu
only been evaluated as reported historically by East Star ge
represented as such in this announcement.
· Sampling data has been compared between reports.
· No verification sampling of the historical assays has been co
Criteria
JORC Code explanation
Commentary
Location of
data points
· Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
· Drill holes were surveyed using Garmin GPSMAP 62S handhe
planned once all drilling is completed.
· Specification of the grid system used.
· Quality and adequacy of topographic control.
Data spacing
and
distribution
· Data spacing for reporting of Exploration Results.
· Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
· Whether sample compositing has been applied.
· Grid system WGS84, UTM44N.
· 20 historical drill holes have been located in the area during m
· Some errors were noted in the elevation readings (from 5 - 1
to the elevation values of the SRTM topography over the ar
· Historical drilling grid for the Rulikha deposit: 200 x 100 m for
m or 300 x 200 m for P1 category.
· Geological distribution is sufficient for an exploration target
calcluations.
· Significant intercepts are reported for results from 2024 drilli
parameters:
Parameter
Report 1
Report 2
R
Element
Cu
Cu
Z
Min Cut-off Grade %
1
0.3%
0
Max Cut-off Grade %
n/a
n/a
n
Min Intercept Length (metres)
n/a
2m
n
Maximum Consecutive Internal Waste (m)
2m
2m
2
Minimum Intercept Grade %
n/a
All (no
filter)
A
fi
Co-elements in report
Pb, Zn
Pb, Zn
C
·
Orientation of
data in
relation to
geological
structure
· Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering the
deposit type.
Sample
security
· The measures taken to ensure sample security.
· Sample security is unclear and cannot be verified by East Sta
Audits or
reviews
· The results of any audits or reviews of sampling
techniques and data.
· No audits were undertaken for this work.
· If the relationship between the drilling orientation
and the orientation of key mineralized structures
is considered to have introduced a sampling
bias, this should be assessed and reported if
material.
· Samples were reportedly taken for intervals with significant s
· The ore body generally dips 10 to 25°to the SW. In some part
steeper 40. These steeper areas of mineralization are interp
mineralization deformation.
· The ore body is cut by NS and EW faults.
Section 2 Reporting of Exploration Results
Criteria
JORC Code explanation
Commentary
Mineral
tenement and
land tenure
status
· Type, reference name/number,
location and ownership
including agreements or
material issues with third
parties such as joint ventures,
partnerships, overriding
royalties, native title interests,
historical sites, wilderness or
national park and
environmental settings.
· The Rulikha polymetallic Deposit is partially located in the
eastern part of exploration license 1799-EL (the "License"). The
license was issued to Rudny Resources Limited on 28 July 2022
for initial period of 6 years with a possibility of further five
years extension subject to reduction of the license area by
40%.
· The security of the tenure held at
the time of reporting along with
any known impediments to
obtaining a licence to operate
in the area.
· East Star resources have servitude for exploration from the
local Akim (administrative head), and local landholders, over
some areas within the Licence and the license can be explored
under these agreements. Additional agreements will be
required for the Rulikha deposit.
· Some other areas within the Licence are restricted in access
due to hydrogeological constraints. Additional permission will
be required to gain access to drill within these areas.
Criteria
JORC Code explanation
Commentary
· There are no known legal or security impediments to obtaining
a mining license.
Exploration
done by other
parties
· Acknowledgment and appraisal
of exploration by other parties.
· Table of previously completed exploration
Principal author,
year
Period
1948
Exploration
Results
1948
Prospecting and
exploration at
Talovskoye and
Openyshevskoye
deposits by Priirtysh
Geological Exploration
Party.
Identified polymetallic
deposits in Rudny Altai,
including early
recognition of Rulikha
and Talovskoye
potential.
1950-1954
19501953
Prospecting and
exploration by
Shemonaikha Party of
Altai Expedition, focusing
on geological mapping
and initial drilling.
Confirmed polymetallic
mineralization in the
Rulikha area,
establishing a
foundation for further
exploration.
1955-1963
19541962
Geological mapping,
drilling, and reserve
calculation by
Shemonaikha GRP.
Consolidated report in
1957 calculated reserves
for Rulikhinskoye.
Delineated Rulikha
deposit's geological
structure; reserves
calculated as of
01.01.1957, confirming
VMS-polymetallic
mineralization (Cu, Pb,
Zn).
1968
1968
Geological structure and
mineral resource
assessment of M-44-57B, G; M-44-58-A-v sheets.
Provided regional
geological context,
supporting Rulikha's
placement within the
Aleysk anticlinorium.
1965-1970
19651969
Geological prospecting
by Shemonaikha GRP,
including geophysical
surveys and drilling.
Refined geological and
geophysical
understanding of
Rulikha, identifying orehosting structures.
1971
19681971
Geological and
geophysical work by
Priirtyshskaya Party at
Rulevsky site.
Further delineated
Rulikha's mineralization,
confirming its association
with TalovskayaGerikhovskaya
formation contact.
1979
1979
General prospecting at
Buzanikhinsky area,
adjacent to Rulikha.
Identified additional
mineralization potential
near Rulikha,
supporting regional
prospectivity.
1983
19781982
Detailed prospecting by
Minsk GRP at
RulikhinskoVydrikhinsky area;
drilling and geophysical
surveys.
Confirmed extent of
Rulikha mineralization,
refined ore zone
boundaries, and
identified vein-type ores.
1983
19791983
Detailed prospecting by
Ubin GRP at TalovskoRulevsky area, focusing
on Talovskoye and
Rulikha flanks.
Positive assessment of
Talovskoye; Rulikha
flanks showed limited
economic potential but
warranted further
study.
1992
19891992
Deep drilling (6,785 m),
geophysical logging
(6,607 m gamma), 737
geochemical samples, 16
core samples; X-ray
Negative assessment for
Rulikha deep horizons
(to 1000 m); vein-type
ores in borehole No. 323
(3.60-5.84% Zn)
Criteria
JORC Code explanation
Commentary
Principal author,
year
1948
ESR
Geology
· Deposit type, geological
setting, and style of
mineralisation.
Period
1948
2024
Exploration
Results
spectral analysis for Cu,
Pb, Zn, Co, Mo.
uneconomic. Talovskoye
deemed promising with
P1/P2 resources,
recommended for
further drilling (9,250 m).
Prospecting and
exploration at
Talovskoye and
Openyshevskoye
deposits by Priirtysh
Geological Exploration
Party.
Identified polymetallic
deposits in Rudny Altai,
including early
recognition of Rulikha
and Talovskoye
potential.
Drilling of six verification
and
in-fill
holes,
topography
survey,
development
of
lithological model
MRE report
· Rulikha is Volcanogenic Massive Sulphide (VMS) deposit.
Historical reports indicate that the type is felsic bimodal (or
Kuroko-type).
· The mineralization is lenticular massive and disseminated
sulphides hosted in volcaniclastic units sub horizontal units.
· Mineralisation occurs as zinc rich and copper-zinc rich units
· The area has seen post depositional de
Share your feedback
Discover