East Star Resources - VMS Copper Drilling Results
Released
Released
Announcement PDF
RNS Number : 3309X
East Star Resources PLC
17 February 2025
17 February 2025
East Star Resources Plc
("East Star" or the "Company")
VMS Copper Drilling Results
Results expected to add tonnes to existing resources and lower strip ratio of open pit development
East Star Resources Plc (LSE:EST), which is exploring for copper and gold in Kazakhstan, is pleased to provide initial
drill results from Q4 2024 drilling at the Verkhuba Copper Deposit ("Verkhuba") in the East Region of Kazakhstan.
Assays from all 238 core samples taken from three drill holes have been received with several new mineralised
zones intersected.
Highlights:
· All holes intersected ore grade mineralisation
· Mineralisation is recorded outside the current modelled ore bodies but within the open pit shell, potentially
leading to a Mineral Resource increase
· Intercepts include:
Hole_ID
VU_24_DD_007A
Intercept
VU_24_DD_008A
0.7m @ 2.94% Cu and 0.17% Zn from 60.1m
4.0m @ 0.69% Cu from 210.1m including 0.5m @ 2.59% Cu from 211.8m
0.6m @ 1.99% Cu from 54.2m
5.1m @ 1.43% Cu from 170.2m
0.5m @ 1.63% Cu from 221.5m
VU_24_DD_027A
1.4m @ 2.88% Zn and 0.28% Cu from 172.8m
Alex Walker, East Star CEO, commented:
"We are very pleased with these results, having drilled outside the current resource envelope and intersected numerous ore
grade intervals. In the current open pit model, provided by AMC Consulting, these new intersections that were previously
classified as waste will now be converted to ore. This supports our view that the ore lenses comprising the current resource
model extend further and so additional drilling in these areas will potentially grow the resource and improve the
economics.
It is important to note that the three drill holes completed were not targeting the thickest, shallowest or highest-grade
portions of the resource and so we look forward to getting the drill rig turning again in Q2 2025."
Further Information
The new intervals were intercepted within the previously modelled open pitshell but outside ofEast Star's 2024
Verkhuba Mineral Resource Estimate (See Figure 1).The mineralised intervals appear to correlate withthe same
stratigraphic unit as existing modelled ore bodies, allowing these to join up along strike and therefore these drill
results should add tonnes to the existing resources and lower the strip ratio of an open pit development. Holes
VU_24_DD_007A and VU_24_DD_008A infilled gaps in the southern part of the deposit to approximately 100m drill
spacing.Highlighted intercepts were reported using cut off grades of 0.3% for copper and 0.8% for zinc and limit of
2m maximum consecutive internal waste.
Figure 1: 2024 drilling demonstrating ore in gaps in the current resource envelope
East Star Resources Plc
Alex Walker, Chief Executive Officer
Tel: +44 (0)20 7390 0234 (via Vigo Consulting)
SI Capital (Corporate Broker)
Nick Emerson
Tel: +44 (0)1483 413 500
Vigo Consulting (Investor Relations)
Ben Simons / Peter Jacob
Tel: +44 (0)20 7390 0234
About East Star Resources Plc
East Star Resources is focused on the discovery and development of copper and gold in Kazakhstan. East Star's
management are based permanently on the ground, supported by local expertise. The Company is pursuing
three exploration strategies:
·
A Volcanogenic Massive Sulphide (VMS) discovery with a maiden JORC MRE of 20.3Mt @ 1.16% copper,
1.54% zinc and 0.27% lead, in an infrastructure-rich region, amenable to a low capex development
·
Copper porphyry and epithermal gold exploration, with multiple opportunities for Tier 1 deposits,
supported by an initial $500k grant from BHP Xplor in 2024
· Sediment-hosted copper exploration with Getech where the initial targeting strategy is at no cost to East
Star
Visit our website:
www.eaststarplc.com
Follow us on social media:
LinkedIn: https://www.linkedin.com/company/east-star-resources/
X (formerly Twitter): https://twitter.com/EastStar_PLC
Subscribe to our email alert service to be notified whenever East Star releases news:
www.eaststarplc.com/newsalerts
The person who arranged for the release of this announcement was Alex Walker, CEO of the Company.
Competent Person Statement
Scientific or technical information in this disclosure related to exploration was reviewed by Dr
Tremain Woods, a full-time employee of Discovery Ventures Kazakhstan Ltd, a 100% owned
subsidiary of East Star Resources PLC. Dr Woods is a member in good standing with the
Geological Society of South Africa. He has sufficient experience that is relevant to the commodity,
style of mineralization or type of deposit under consideration and activity which he is undertaking
to qualify as a Competent Person under the JORC code (2012 Edition).
JORC Code, 2012 Edition - Table 1
Section 1 Sampling Techniques and Data
Criteria
JORC Code explanation
Sampling
techniques
· Nature and quality of sampling (e.g. cut channels,
random chips, or specific specialised industry
standard measurement tools appropriate to the
minerals under investigation, such as down hole
gamma sondes, or handheld XRF instruments,
etc). These examples should not be taken as
limiting the broad meaning of sampling.
·
Samples were taken from half drill core through sulphid
·
Sampling was conducted through mineralized intervals
the hanging wall and footwall for intervals larger than 3
meters), only the mineralized portion is sampled.
·
Sample quality is ensured by a structured scheme, inclu
materials (CRM), and duplicates.
·
Banks are inserted at the beginning and end of large, m
smaller isolated intervals.
·
CRMs are inserted at every 50th and 100th sample to m
·
Coarse duplicates are taken every 40th and 80th sample
portions, and 5% of mineralized pulps are sent for exte
· Aspects of the determination of mineralisation
that are Material to the Public Report.
·
A total of 191.4 meters of core were sampled, with 216 c
12 blanks, 5 CRMs, and 5 duplicate samples.
· In cases where 'industry standard' work has been
done this would be relatively simple (e.g.
'reverse circulation drilling was used to obtain 1
m samples from which 3 kg was pulverised to
produce a 30 g charge for fire assay'). In other
cases, more explanation may be required, such
as where there is coarse gold that has inherent
sampling problems. Unusual commodities or
mineralisation types (e.g. submarine nodules)
may warrant disclosure of detailed information.
·
Core samples were prepared by ALS Kazgeochemistry L
crushing, sieving (<70% passing 2mm), and milling (>85
·
Samples are analysed using the ME-ICP41 method for ro
ore samples, the ME-OG62 method is used.
· Include reference to measures taken to ensure
sample representivity and the appropriate
calibration of any measurement tools or
systems used.
Drilling
techniques
Drill sample
recovery
Commentary
· Drill type (e.g. core, reverse circulation, open-hole
hammer, rotary air blast, auger, Bangka, sonic,
etc) and details (e.g. core diameter, triple or
standard tube, depth of diamond tails, facesampling bit or other type, whether core is
oriented and if so, by what method, etc).
· Drilling was conducted using stand HQ sized diamond drilling
· Method of recording and assessing core and chip
sample recoveries and results assessed.
· Core recovery was measured by East Star geologists, an aver
recorded for the three completed drill holes.
· Positive Group Kazakhstan undertook drilling.
· Drill core was orientated using a REFLEX Act III orientation to
vertically were orientated once solid core was intersected.
· After drilling was completed, all holes were survey at 50 m int
survey tool
· Through the mineralized intervals, core recovery was 97% an
Criteria
JORC Code explanation
Commentary
· Measures taken to maximise sample recovery
and ensure representative nature of the
samples.
· There is no relationship between Cu, Pb or Zn grades and rec
· There does not appear to have been any bias due to sample
· Whether a relationship exists between sample
recovery and grade and whether sample bias
may have occurred due to preferential loss/gain
of fine/coarse material.
Logging
· Whether core and chip samples have been
geologically and geotechnically logged to a level
of detail to support appropriate Mineral
Resource estimation, mining studies and
metallurgical studies.
· East Star geologists undertook core logging.
· Quantitative data for mineralization, lithology, structure, alte
was logged.
· All recovered core was logged and photographed before and
· Whether logging is qualitative or quantitative in
nature. Core (or costean, channel, etc)
photography.
· The total length and percentage of the relevant
intersections logged.
Sub-sampling
techniques
and sample
preparation
· If core, whether cut or sawn and whether quarter,
half or all core taken.
· Half core samples were collected for processing, the remainin
East Star's core storage facilities in Verkhuba Village
· If non-core, whether riffled, tube sampled, rotary
split, etc and whether sampled wet or dry.
· Samples were crushed into chips; the chips were passed thro
to obtain 500 g samples for milling. Crushed sample duplica
homogeneity of crushed samples.
· For all sample types, the nature, quality, and
appropriateness of the sample preparation
technique.
· Quality control procedures adopted for all subsampling stages to maximise representivity of
samples.
· Blank granite material was also inserted into the sample stre
occurs during crushing or milling.
· ALS laboratories weigh samples before and after sieving, to e
fractions are met for each sample.
· Measures taken to ensure that the sampling is
representative of the in-situ material collected,
including for instance results for field
duplicate/second-half sampling.
· Whether sample sizes are appropriate to the
grain size of the material being sampled.
Quality of
assay data
and
laboratory
tests
· The nature, quality and appropriateness of the
assaying and laboratory procedures used and
whether the technique is considered partial or
total.
· For geophysical tools, spectrometers, handheld
XRF instruments, etc, the parameters used in
determining the analysis including instrument
make and model, reading times, calibrations
factors applied and their derivation, etc.
· Aqua regia is a partial digest method well suited to base met
internationally recognized and provides precise and accura
· Standard assay quality controls are used by the laboratory a
samples to evaluate and confirm the assay results. All QA/Q
· Nature of quality control procedures adopted
(e.g. standards, blanks, duplicates, external
laboratory checks) and whether acceptable
levels of accuracy (i.e. lack of bias) and precision
have been established.
Verification of
sampling and
assaying
· The verification of significant intersections by
either independent or alternative company
personnel.
· The use of twinned holes.
· Documentation of primary data, data entry
procedures, data verification, data storage
· Significant intersections were confirmed visually by East Star
independent verification has been completed to date.
· Logged data was inspected by East Star's exploration manag
data were made before data was sent to Rock Solid based i
the maintained SQL database
Criteria
JORC Code explanation
Commentary
(physical and electronic) protocols.
· Discuss any adjustment to assay data.
Location of
data points
· Accuracy and quality of surveys used to locate
drill holes (collar and down-hole surveys),
trenches, mine workings and other locations
used in Mineral Resource estimation.
· Specification of the grid system used.
· Quality and adequacy of topographic control.
Data spacing
and
distribution
· Data spacing for reporting of Exploration Results.
· Whether the data spacing and distribution is
sufficient to establish the degree of geological
and grade continuity appropriate for the
Mineral Resource and Ore Reserve estimation
procedure(s) and classifications applied.
· Whether sample compositing has been applied.
· Drill holes were surveyed using Garmin GPSMAP 62S handhe
planned once all drilling is completed.
· Grid system WGS83, UTM44N
· Some errors were noted in the elevation readings (from 5 - 1
to the elevation values of the LIDAR topography survey at t
· A drone LIDAR survey was conducted in 2023. The survey co
used a drone mounted LIDAR sensor (DJI Zenmuse L1 Lidar
D-RTK 2 drone) with a base station (Trimble R12 and Trimble
lines were 90 m apart, and the resolution produced was 3.4
terrane model was checked against control points.
· Historical drilling was drilled along NW-SE trending lines, the
300m apart and drill holes were spaced between 100 and 25
· Current drilling aims to infill the spacing to ~120m.
· The current drill holes have reduced the spacing within the U
AMC in April 2024 to ~100m.
· Geological distribution is sufficient for inferred resources thr
(from April 2024). Some parts have sufficient spacing to be c
· Significant intercepts are reported for results from 2024 drilli
parameters:
Parameter
Report 1
Report 2
R
Element
Cu
Cu
Z
Min Cut-off Grade %
1
0.3%
0
Max Cut-off Grade %
n/a
n/a
n
Min Intercept Length (metres)
n/a
2m
n
Maximum Consecutive Internal Waste (m)
2m
2m
2
Minimum Intercept Grade %
n/a
All (no
filter)
A
fi
Co-elements in report
Pb, Zn
Pb, Zn
C
·
Orientation of
data in
relation to
geological
structure
Sample
security
· Whether the orientation of sampling achieves
unbiased sampling of possible structures and
the extent to which this is known, considering the
deposit type.
· If the relationship between the drilling orientation
and the orientation of key mineralized structures
is considered to have introduced a sampling
bias, this should be assessed and reported if
material.
· The measures taken to ensure sample security.
· Sampling is taken for all intervals with sulphide mineralizatio
· Sampling adhered to lithological boundaries and additionally
was sampled.
· The ore body generally dips 30 to 40 to the SW. In some part
steeper 80. These steeper areas of mineralization are interp
mineralization deformation.
· The ore body is cut by steep NE faults, these normal faults ar
ore body 20-40 m
· After samples are cut and bagged, they are sealed with zip tie
Star's senior geologist to ALS Oskemen.
· The samples remained sealed until handed over to the labor
· Samples in the laboratory follow ALS standard procedures to
Audits or
reviews
· The results of any audits or reviews of sampling
techniques and data.
Section 2 Reporting of Exploration Results
· No audits were undertaken for this phase of sampling.
· The sample methodology was checked and confirmed by the
MRE (April 2024)
Criteria
JORC Code
explanation
Commentary
Mineral
tenement and
land tenure
status
· Type, reference
name/number,
location and
ownership
including
agreements or
material issues
with third parties
such as joint
ventures,
partnerships,
overriding
royalties, native
title interests,
historical sites,
wilderness or
national park and
environmental
settings.
· The Verkhuba polymetallic deposit is located in the eastern part of exploration license 179
(the "License"). The license was issued to Discovery Ventures Kazakhstan Limited (the "D
27 July 2022 for initial period of 6 years with a possibility of further five years extension su
reduction of the license area by 40%.
· East Star resources have servitude for exploration from the local Akim (administrative hea
license can be explored under these agreements.
· There are no known legal or security impediments to obtaining a mining license
· The security of the
tenure held at the
time of reporting
along with any
known
impediments to
obtaining a
licence to operate
in the area.
Exploration
done by other
parties
· Acknowledgment
and appraisal of
exploration by
other parties.
· Table of previously completed exploration
Principal author, year
Period
Exploration
Results
Yakovlev et al., 1950
1948-1950
Geological mapping
Geological map 1:10,000
Krysova et al., 1954
1953-1954
Geological mapping
Geological map 1:10,000
Yusupov et al., 1956
1956
Geological traverses, core drilling
Potential of oxidation zone
Anoshin et al., 1972
1971-1972
Geological, geochemical survey, shallow
prospecting shafts and drilling, ground
IP, EM, magnetics, core drilling
Follow-up targets, discovery
mineralized zones at depth
Rodionov, Gorelova, 1976
1974-1976
Geological traverses, deep drilling
Follow-up targets, prognostic r
Avdonin et al., 1977
1974-1977
Mapping of Devonian volcanic centres
Follow-up targets, maps of
proximal volcanic facies
Nazarov, San'kov, 1986
1982-1986
Geological mapping at scale 1:50,000,
ground IP, EM, magnetics, diamond
drilling on the anomalies
Prognostic resources
Radchenko et al., 1987
1985-1987
Grid drilling 800-400 x 400-200 m,
geochemical sampling, ground IP, EM,
magnetics
Follow-up
targets,
mineralization
Grigorovich et al., 1990
1986-1988
Infill diamond drilling 200 x 400, 100 x
200, 75 x 100-180 m, underground
development (an adit and drives)
totalling 3001 m, metallurgical testing
Completion of drilling databa
Verkhuba deposit for follow-u
trac
Criteria
JORC Code
explanation
Commentary
Principal author, year
Geology
· Deposit type,
geological
setting, and style
of
mineralisation.
Period
Exploration
Results
Ermolaev et al., 1990
1990
Technical economic consideration of
Verkhuba deposit
ESR
2023
Exploration Target estimate
Exploration
(JORC)
ESR
2024
Drilling of six verification and in-fill
holes, topography survey, development
of lithological model
MRE report
Mineral resource estimate
categories (GKZ)
Target
estimat
· Verkhuba is Volcanogenic Massive Sulphide (VMS) deposit. Historical reports indicate that
type is felsic bimodal (or Kuroko-type).
· The mineralization is lenticular massive and disseminated sulphides hosted in volcaniclast
sub horizontal units.
· Mineralisation occurs as a copper rich unit at shallower depths (<150 m) and a zinc-coppe
deeper (~200m)
· The area has seen post depositional deformation in the form of folding and faulting
Drill hole
Information
· A summary of all
information
material to the
understanding
of the
exploration
results including
a tabulation of
the following
information for
all Material drill
holes:
o easting and
northing of
the drill
hole collar
o elevation or
RL
(Reduced
Level elevation
above sea
level in
metres) of
the drill
hole collar
o dip and
azimuth of
the hole
o down hole
length and
interception
depth
o hole length.
· If the exclusion of
this information
· Drill hole information:
Drillhole
Name
VU_24_DD007A
VU_24_DD008
VU_24_DD008A
VU_24_DD027A
X
Y
Z
Dip
Azimuth
603754
603661
603660
603488
5591358
5591388
5591397
5591275
402
466
466
494
-70
-65
-70
-90
340
335
5
0
Target
Depth
Current
Depth
Date
Started
D
Com
280
260
260
251
270
110,5
268,0
251,0
11/17/2024
11/04/2024
12/12/2024
12/03/2024
11/2
11/1
12/1
12/1
· Significant intercepts:
Hole_ID
VU_24_DD_007A
VU_24_DD_008A
VU_24_DD_027A
Intercept
0.7m @ 2.94% Cu and 0.17% Zn from 60.1m
4.0m @ 0.69% Cu from 210.1m including 0.5m @ 2.59% Cu from 211.8m
0.6m @ 1.99% Cu from 54.2m
5.1m @ 1.43% Cu from 170.2m
0.5m @ 1.63% Cu from 221.5m
1.4m @ 2.88% Zn and 0.28% Cu from 172.8m
· No material information has been excluded from this report
Criteria
JORC Code
explanation
Commentary
is justified on the
basis that the
information is
not Material and
this exclusion
does not detract
from the
understanding
of the report, the
Competent
Person should
clearly explain
why this is the
case.
Data
aggregation
methods
· In reporting
Exploration
Results, weighting
averaging
techniques,
maximum and/or
minimum grade
truncations (e.g.
cutting of high
grades) and cutoff grades are
usually Material
and should be
stated.
· Significant intercepts are reported for results from 2024 drilling using the following param
Parameter
Report 1
Report 2
Report 3
Element
Cu
Cu
Zn
Min Cut-off Grade %
1
0.3%
0.8%
Max Cut-off Grade %
n/a
n/a
n/a
Min Intercept Length (metres)
n/a
2m
n/a
Maximum Consecutive Internal Waste (m)
2m
2m
2m
Minimum Intercept Grade %
n/a
All (no
filter)
All (no
filter)
Co-elements in report
Pb, Zn
Pb, Zn
Cu, Pb
· No metal equivalents are reported.
· Results for 32 elements received, but only Cu, Pb Zn is reported.
· Where aggregate
intercepts
incorporate short
lengths of highgrade results and
longer lengths of
low-grade results,
the procedure
used for such
aggregation
should be stated
and some typical
examples of such
aggregations
should be shown
in detail.
· The assumptions
used for any
reporting of metal
equivalent values
should be clearly
stated.
Relationship
between
mineralisation
widths and
intercept
lengths
· These relationships
are particularly
important in the
reporting of
Exploration
Results.
· The ore bodies are generally concordant to lithology (perpendicular to core axis). At some
mineralization occurs as steeply dipping veins and veinlets with limited extent (low angle
core axis).
· Drill holes were planned at 65 - 70° towards the north to intercept mineralisation at perpe
angles. Mineralisation is typically sub-horizontal in core indicating that the true thickness
of the thickness of intervals in core. Therefore, one can assume that intervals thickness a
drilled.
Criteria
JORC Code
explanation
Commentary
· If the geometry of
the mineralisation
with respect to the
drill hole angle is
known, its nature
should be
reported.
· If it is not known
and only the down
hole lengths are
reported, there
should be a clear
statement to this
effect (e.g. 'down
hole length, true
width not known').
Diagrams
· Appropriate maps
and sections (with
scales) and
tabulations of
intercepts should
be included for
any significant
discovery being
reported These
should include
but not be limited
to a plan view of
drill hole collar
locations and
appropriate
sectional views.
· Relevant diagrams have been included in the body text
Balanced
reporting
· Where
comprehensive
reporting of all
Exploration
Results is not
practical,
representative
reporting of both
low and high
grades and/or
widths should be
practiced to avoid
misleading
reporting of
Exploration
Results.
· Grades below the cut off parameters have not been reported with these results. However
mineralization has been noted within East Star's models and will inform future estimates
Other
substantive
exploration
data
· Other exploration
data, if
meaningful and
material, should
be reported
including (but not
limited to):
geological
observations;
· Not applicable
Criteria
JORC Code
explanation
Commentary
geophysical
survey results;
geochemical
survey results;
bulk samples size and method
of treatment;
metallurgical test
results; bulk
density,
groundwater,
geotechnical and
rock
characteristics;
potential
deleterious or
contaminating
substances.
Further work
· The nature and
scale of planned
further work (e.g.
tests for lateral
extensions or
depth extensions
or large-scale
step-out drilling).
· Diagrams clearly
highlighting the
areas of possible
extensions,
including the main
geological
interpretations
and future drilling
areas, provided
this information is
not commercially
sensitive.
Appendix 1: Assays Results
· The three completed drill holes totalling 789 m of a planned 1,500 m of initial drilling. Shou
drilling continue to provide satisfactory results a second phase of 3,000 m of infill drilling
planned.
· Map of planned and completed drillholes is included in the body text.
Hole_ID
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_007A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
Depth_From
0
10.2
16
17
20.6
21.6
28.1
38
42
43
48.5
58.1
60.1
60.8
61.5
74.2
74.9
80.5
81.3
84.2
186.5
189
203.2
210.1
211
211.8
212.3
213.1
214.1
218.4
0
14.4
15.9
16.9
17.4
18
18.5
38.9
40.4
43.8
44.3
44.9
45.4
51.5
53.5
54.2
54.8
55.7
57.2
58
59
60.5
61.5
62
62.5
63.5
64.4
67.4
69.7
71.1
72
72.5
78.3
87
129.8
130.3
131.7
141.7
145.6
146.2
152
166.1
170.2
Depth_To
10.2
16
17
20.6
21.6
28.1
38
42
43
48.5
58.1
60.1
60.8
61.5
74.2
74.9
80.5
81.3
84.2
186.5
189
203.2
210.1
211
211.8
212.3
213.1
214.1
218.4
270
14.4
15.9
16.9
17.4
18
18.5
38.9
40.4
43.8
44.3
44.9
45.4
51.5
53.5
54.2
54.8
55.7
57.2
58
59
60.5
61.5
62
62.5
63.5
64.4
67.4
69.7
71.1
72
72.5
78.3
87
129.8
130.3
131.7
141.7
145.6
146.2
152
166.1
170.2
170.8
Cu_pct
Pb_pct
Zn_pct
0.175
0.0004
0.011
0.137
0.0006
0.0585
0.166
0.0009
0.037
2.94
0.265
0.0647
0.0908
0.173
0.253
0.1975
0.0004
0.0483
0.129
0.0004
0.0297
0.908
0.0006
0.0238
2.59
0.001
0.0385
0.621
0.0004
0.0229
0.286
0.0003
0.0078
0.317
0.106
0.0003
0.0003
0.0146
0.0225
0.304
1.985
0.259
0.0003
0.0011
0.0003
0.0249
0.0247
0.0102
0.275
0.0002
0.0093
0.1215
0.41
0.1365
0.1175
0.264
0.225
0.0002
0.0003
0.0002
0.0002
0.0002
-0.0002
0.0108
0.0115
0.0089
0.0089
0.008
0.0083
0.125
0.0003
0.0095
0.1975
0.0005
0.0113
0.306
0.0133
0.026
Notes
not assayed
no significant intercept
HCORE
no significant intercept
HCORE
no significant intercept
not assayed
no significant intercept
HCORE
no significant intercept
not assayed
no significant intercept
HCORE
HCORE
no significant intercept
HCORE
no significant intercept
HCORE
no significant intercept
not assayed
no significant intercept
not assayed
no significant intercept
HCORE
no significant intercept
HCORE
no significant intercept
HCORE
no significant intercept
not assayed
not assayed
no significant intercept
not assayed
no significant intercept
HCORE
no significant intercept
not assayed
no significant intercept
no data
no significant intercept
HCORE
HCORE
not assayed
no significant intercept
HCORE
HCORE
HCORE
no significant intercept
HCORE
no significant intercept
HCORE
HCORE
HCORE
HCORE
HCORE
HCORE
no significant intercept
not assayed
no significant intercept
HCORE
no significant intercept
not assayed
no significant intercept
not assayed
no significant intercept
no significant intercept
not assayed
no significant intercept
HCORE
no significant intercept
not assayed
no significant intercept
HCORE
Hole_ID
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_008A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
VU_24_DD_027A
Depth_From
170.8
172
173.1
174.2
175.3
177.3
203.5
205.5
214.3
215.6
216.1
221
221.5
222
222.5
0
47.9
49.5
73.2
98
105
111.9
164.5
166.2
172.3
172.8
173.5
174.2
174.8
185.3
188
194.5
196.9
221.8
228
Depth_To
172
173.1
174.2
175.3
177.3
203.5
205.5
214.3
215.6
216.1
221
221.5
222
222.5
268
47.9
49.5
73.2
98
105
111.9
164.5
166.2
172.3
172.8
173.5
174.2
174.8
185.3
188
194.5
196.9
221.8
228
251
Cu_pct
1.02
0.965
2.42
1.97
Pb_pct
0.0074
0.0081
0.0062
0.0051
Zn_pct
0.0484
0.0374
0.0621
0.0834
0.119
0.0004
0.0167
1.63
0.0027
0.0206
0.273
0.278
0.0112
0.0042
3.59
2.16
Notes
HCORE
HCORE
HCORE
HCORE
no significant intercept
not assayed
no significant intercept
no data
no significant intercept
HCORE
not assayed
no significant intercept
HCORE
no significant intercept
not assayed
not assayed
no significant intercept
not assayed
no significant intercept
not assayed
no significant intercept
not assayed
no significant intercept
not assayed
no significant intercept
HCORE
HCORE
no significant intercept
not assayed
no significant intercept
not assayed
no significant intercept
not assayed
no significant intercept
not assayed
This information is provided by RNS, the news service of the London Stock Exchange. RNS is approved by the Financial Conduct
Authority to act as a Primary Information Provider in the United Kingdom. Terms and conditions relating to the use and distribution of
this information may apply. For further information, please contact rns@lseg.com or visit www.rns.com.
RNS may use your IP address to confirm compliance with the terms and conditions, to analyse how you engage with the information
contained in this communication, and to share such analysis on an anonymised basis with others as part of our commercial services.
For further information about how RNS and the London Stock Exchange use the personal data you provide us, please see our Privacy
Policy.
END
DRLGZGMZNNFGKZG
Share your feedback
Discover